Single head belt weighre

18

PI/FL/2

Project Proposer 1

Ankush Joshi

Nonfood


New Equipment
Project
 
Start Date
End Date
Plan
23-01-2023
Actual
05-11-2023


91

4,00000.00

5,00000.00

10,000.00

0.00

No
Gate 1
 
Start Date
End Date
Plan
23-01-2023
25-01-2023
Actual
05-11-2023
05-12-2023
  Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
  Amount Value Amount Value Amount Value Amount Value Amount Value Amount Value
Target Price/Per Unit (Exp)
Target Price/Per Unit (DOM)
Target Cost (INR) (Exp)
Target Cost (INR) (DOM)
Market Size (No) / Yr (DOM)
Market Size (INR) / Yr (DOM)
Market Size (No) / Yr (Exp)
Market Size (USD) / Yr (Exp)
Total Market Size
Market Addressable (Exp)
Market Addressable (Dom)
Total Market Addressable
  Year 1 Year 2 Year 3 Year 4
  Unit Amount Value Unit Amount Value Unit Amount Value Unit Amount Value





















Specifications
UOM
Target
Achieved Gate 1
Current Nichrome
Product type
Product Characteristics and nature
Angle of repose or sliding angle degree
Bulk density gm/cm square
fill quantity Gram
Belt weigher type
Filling Range Gram
Machine name
Accuracy Gram
fill time mili seconds
seal time mili seconds
cycle time mili seconds
Pouch size W x L X seal width Milimeter
Bucket volume Centimeter
Auxillary bucket volume Centimeter
Load cell capacity Centimeter
Hopper capacity Centimeter
Material of contact parts
Material of construction
Power required Feet
supply voltage Milimeter
Power consumption Miligram
Automation make
PLC make
Pneumatic make
Air consumption Microgram
MHS type
Feed rate Kilogram
weight Gram
foot printW x L x H Ounce
  • 1.1
    •  1.01.01
      •  
        1.1.1.1

        Post inspection of parts received


        22 Apr 2022
        50
        25 Apr 2022
    •  1.01.02

      • Post inspection of parts received


        22 Apr 2022
        50
        25 Apr 2022
  • 1.2
    •  1.02.01
      • 1.2.1.1

        Post inspection of parts received


        22 Apr 2022
        50
        25 Apr 2022
  • 1.3

    • Post inspection of parts received


      22 Apr 2022
      50
      25 Apr 2022

Other Feedback Upload
Download Specification Upload Specifications
Other Feedback Upload Other Feedback









Gantt Chart Gantt Chart Action Items Completed